![](http://elmsparkstg.wpengine.com/wp-content/uploads/2022/07/Top-banner.jpg)
Recent Changes
Since the submission of the outline planning application for Elms Park was submitted there have been ongoing discussions with stakeholders about the proposals. As a result, the Elms Park Consortium has submitted an addendum report to provide updated information that includes:
- Changes to the location and shape of the secondary school and first primary school which have been reconfigured and moved closer to the centre of Elms Park
- An increase in the size of the green buffer space between the new development and Swindon Village to reflect the Local Greenspace Design in the Cheltenham Local Plan
- A number of changes to land use including ensuring that part of the frontage onto Tewkesbury Road will be specified for residential use rather than for mixed use
A copy of the full addendum report and supporting documents can be found here
![](http://elmsparkstg.wpengine.com/wp-content/uploads/2022/07/iStock_000014841547Large-1024x582.jpg)
New Schools’ Position
Original
![](https://elmsparkstg.wpengine.com/wp-content/uploads/2022/07/School-map-old-1-1024x714.jpg)
Revised
![](http://elmsparkstg.wpengine.com/wp-content/uploads/2022/07/School-map-new-1-1024x811.jpg)
Changes around Swindon Village
Original
![](https://elmsparkstg.wpengine.com/wp-content/uploads/2022/07/Swindon-village-old-v2-1024x771.jpg)
Revised
![](https://elmsparknwc.co.uk/wp-content/uploads/2022/07/Swindon-village-new-V10-1024x706.jpg)